Roasting production line upgrade project environmental impact assessment public participation first publicity


Release time:

2019-03-05

Jinan Longshan Carbon Co., Ltd. currently has the overall equipment of calcination and molding system in the industry leading the development of the industry. The original roasting system was limited by the technical level of the industry at the time of construction, although it is at the domestic intermediate level, but with the enterprise in the industry.

Jinan Longshan Carbon Co., Ltd. roasting production line upgrade project

Environmental Impact Assessment Public Participation First Publicity

 

I. Project Overview

Jinan Longshan Carbon Co., Ltd. currently has the overall equipment of calcination and molding system in the industry leading the development of the industry. The original roasting system was limited by the technical level of the industry at the time of construction,   although it is at the domestic intermediate level, but with the enterprise in the industry.  The positioning is obviously inconsistent and has become an important obstacle to the overall improvement of the company. After the implementation of this project, the energy consumption per unit product of Jinan Longshan Carbon Co., Ltd. can be effectively reduced, saving a large amount of fuel power purchase cost for the enterprise, improving the quality of the product and the automation degree of the production line, and enhancing the market competitiveness of the product.

 

Second, the construction content

1. The project uses the existing comprehensive warehouse to transform two new ring-type roasters, which optimize the structural design, make the volatiles burn more fully, and the furnace temperature distribution is more uniform; through the use of high-temperature insulation materials and Optimize the insulation design to reduce the heat loss in the furnace; design the size of the tank according to the model of the prebaked anode, increase the volume ratio of the tank, and reduce the energy consumption accordingly. In addition, the roaster combustion device and the automatic temperature control system are updated to achieve precise control of the furnace temperature, which not only ensures product quality but also saves a lot of energy.

2. New roasting multi-functional units, automatic grouping and automatic de-grouping (supporting automatic cleaning) to achieve automation optimization, improve work efficiency and reduce dust-free tissue emissions.

3. Two high-efficiency vertical electric tar catchers are connected in series to remove asphalt smoke more effectively; the flue gas after electric trapping process enters the existing desulfurization and wet electric dedusting system, ensuring stable roasting of flue gas. emission.

 

Third, the name of the construction unit and contact information

Construction unit: Jinan Longshan Carbon Co., Ltd.

Contact: Zheng Chengjun

Phone: 13954195369

 

四. Working procedures and main contents of environmental impact assessment

The main working procedures are to investigate and analyze the surrounding environment, and to inspect the materials, field visits, consulting engineering and technical personnel, etc., to basically grasp the factors related to the production and environment of the project, and complete the preparation of the report according to the requirements of relevant technical guidelines.

 

In accordance with the requirements of relevant laws, regulations and technical guidelines of the Law of the People's Republic of China on Environmental Impact Assessment, make full use of existing technical data and combine the project construction to carry out environmental status assessment and environmental impact prediction and evaluation in the project construction area.

 

The focus of this environmental impact assessment is: based on the characteristics of environmental pollution and the surrounding environment characteristics of this construction project, on the basis of detailed and accurate engineering analysis, focus on atmospheric environmental impact assessment, surface water environmental impact analysis, groundwater environmental impact Analysis, solid waste treatment and impact analysis, pollution prevention measures and technical and economic argumentation.

 

五. Main issues for public consultation

1. Any unit or individual that has an environmental interest relationship with the project may submit the project environmental feasibility feasibility opinion and requirements to the construction unit during the project environmental impact assessment work.

2. Any unit or individual that has an environmental interest in the project may propose opinions and requirements for improving the environmental protection measures of the project and preventing project pollution during the environmental impact assessment of the project.

3. After completing the preliminary draft of the project environmental impact report, the construction unit will make another announcement.

4. The construction unit will listen carefully to the public opinions and conduct environmental impact assessment of the project scientifically, fairly, fairly and legally.

 

六. The main way for the public to make comments

Suggestions from individuals, departments, and organizations can be made by letter, telephone, or fax. For further information on the project, please contact the contact person of the construction unit.

It is hereby notified that any unit or individual who has valuable comments or suggestions may contact us within 10 days from the date of publication of this announcement.

 

 

Publicity release unit: Jinan Longshan Carbon Co., Ltd.

Public announcement time: June 2, 2017